If you decide to buy and install a reliable door, then only buy high-quality design with good locks and other components that are important for the input of a metal door. As is known, the correct execution immediately dismantling and assembly work when installing a new steel door – it’s part of the success and ensure that the door will last as long as possible, keeping during the maintenance period and the external beauty and convenience of daily use, and reliability. Speaking candidly Symantha Rodriguez told us the story. For this reason, the installation of steel doors must meet the professionals. Typically, the vendor providing the service (many – free). If you prefer to use the services of professional installers input metal doors, then you need to watch the process, that all was done correctly. When the model produces steel doors, special leave slight discrepancy standard size door – about 1.5 – 2 centimeters. This small difference can more accurately align the door on a level.

Remaining after the installation of metal doors simply filled the gaps foam. But before you start installation of metal doors, it is necessary to dismantle the old one. Removed an old door, removed the door frame, door thoroughly cleaned. May need alignment doorway – removal of cement, all projections and irregularities. Especially a lot of masters paying attention to irregularities because of the level they can be extremely noticeable.

If you install a metal door with a view rough side, it can stand sideways. A slanting position the door in the doorway leads to worse consequences, such as random opening and closing the door (if not close it on the latch or lock), of lock bolts. In this case, we can only give one piece of advice – do not insist on compulsory equalization of a metal door and allow the installers to operate independently. From some of the irregularities can be eliminated by bending a metal casing – so you just get rid of gaps between the wall and the casing. Now, that relates directly to the installation of a metal door. The first step – this is the alignment of the door boxes in the doorway with a large level. The second step – the profile of a metal door from the hinges and locks drilled hole diameter 8-10mm. They need to fix a metal door. Openings doing is under a small bias towards the wall – it must be to avoid chipping the wall. As a rule, you need only two holes – top drilled on the hinge side (under the upper reference loop are indented 5 cm), bottom – at a distance of 5 cm above the base of the loop. With regard to the profile of the castle, there is margin for the holes is about 25-35cm from the top and bottom. Install door frame – first put to temporary or permanent spacers. Securing the door frame (steel door optional). First, the hinged side – through the hole before a slight angle hammer drilled move for a metal pin or anchor bolts to a depth of 10-15cm. Slaughtered pins or anchors, if necessary cut off too much from the pin. Secondly, you need to hang door leaf and check the progress of sash and the density of its closure. These actions are repeated – it’s the same as with the loop party. Now Check all locking devices, up to the gate and “dogs”. Fill foam doorway (insulation). After 24 hours, the foam is dry, cut off excess with a knife.

Sorry, comments are closed.